Sign In | Join Free | My fazendomedia.com |
|
Brand Name : JINZHOU SHITAN
Model Number : Truck-mounted drilling rig.crawler mounted drilling rig
Certification : ISO
Place of Origin : China
MOQ : 1 set
Price : Negotiation
Payment Terms : T/T, Western Union
Supply Ability : 2000 sets per year
Delivery Time : 7-10 days
Packaging Details : Standard Export Package
Product Name : ST 200 Deep Hole Blasting In Rocky Area For Water Well Pneumatic Drilling Rig Equipment
Machine Type : Drilling Equipment
Hole Diameter : Customized
Drilling Depths : 200 meters
Condition : New
Weight : 8.9 T
Warranty : 12 months
Rotation torque : 7500Nm, 983 N.m, 4200N.m, 3400mm
Crawler Mounted Rotary Water Small Drilling Rigs Portable Machine For Sale
ST 200 Pneumatic Drilling Rig Introduction
ST 200 Pneumatic Drilling Rig Series Well Drilling Rig is a light, efficient and versatile drilling equipment powered by diesel engine which is from China famous brand. It is mainly suitable for drilling wells, agricultural irrigation wells and other uses, especially for water extraction in mountainous and rock formations engineering.
ST 200 Pneumatic Drilling Rig Technical Parameter
Model | ST 200 |
Condition | New |
Type | Water Well Drilling Rig |
Power Type | Diesel |
Place of Origin | China |
Brand Name | Shitan |
Usage | Ore |
Dimension(L*W*H) | 6400MM*2250MM*2700MM |
Weight | 5800KG |
Certification | ISO9000 |
Warranty | 1 YEARS |
Marketing Type | New Product 2020 |
Drilling diameter | 90-152mm |
Depth | 25M |
Rotary speed | 0-90rpm |
DTH | K40 |
Drilling Rods | 76*2m+76*3m |
Air consumption | 13-20m3/min |
Travelling | 0-2.5km/h |
projects in rock formations in mountainous areas.
Measures taken during the running in period of water well drilling rig.
1. Pay attention to the working load during the running in period. Generally, the working load during the running in period should not exceed 80% of the rated working load, and appropriate workload should be arranged to prevent overheating caused by long-term continuous operation of the machine.
2. Observe the indication of each instrument frequently. If there is any abnormality, stop the machine in time to eliminate it
3. Pay attention to strengthen the lubrication of each lubricating point. It is recommended that during the running in period, each shift should add lubricating grease to the lubricating point (except for special requirements).
4. Keep the machine clean and adjust and fasten the loose parts in time.
5. At the end of the running in period, the machine shall be compulsorily maintained, inspected and adjusted, and the oil shall be replaced.
In a word, the requirements for the use and maintenance of water well drilling rigs during the running in period can be summarized as: reduce the load, pay attention to inspection, and strengthen lubrication. As long as attention is paid to and maintenance of construction machinery during the running in period is carried out as required, the occurrence of early failures will be reduced, the service life will be extended, the operation efficiency will be improved, and more economic benefits will be brought to you.
![]() |
Rotary Water Small 200m Crawler Mounted Drill Rig Portable Machine Images |