Sign In | Join Free | My fazendomedia.com |
|
Brand Name : ShiTan
Model Number : ST 50
Certification : ISO9001
Place of Origin : China
MOQ : 1 set
Price : Negotiation
Payment Terms : T/T, Western Union
Supply Ability : 2000 sets/year
Delivery Time : Within 7-12 days
Packaging Details : Standard Export package
Type : ST 50 Engineering Drilling Rig
Drilling depth : 50m
Drill pipe diameter : 42mm
Hole size diameter : 73-108mm
Power Type : Diesel
Weight : 480kg
Usage : water well,railways, core drilling
Dimension(L*W*H) : 1180×680×1600mm
Product Introduction
ST 50 engineering drilling rig, it has the advantages of light weight, simple structure, fast drilling speed and large diameter of coring samples. It is a light weight drilling rig, widely used in general geological exploration of railway, road, bridge, dam and tall building base, geological core drilling, small grouting holes, blasting holes, civil wells, and earth central air conditioning wells, etc.
Technical Data
Type | ST50 drilling rig |
Drilling depth (m) | The max. 50 meter |
Hole size diameter | 73-108mm |
Drill pipe diameter | 42mm |
Vertical spindle speed | 70-650 |
Reverse rotation speed | 50-130 |
Power | 5.7KW |
Outsize | 1180×680×1600mm |
Weight (including Gasoline engine ) | 208kg |
Product Feature
It is a portable hydraulic drill in China at present. It is especially suitable for coring operations in special difficult terrain such as mountains, hills and rivers, and for engineering geological survey of buildings such as railways, hydropower, transportation, bridges and dam foundations; Geological core drilling and physical survey; Drilling of small grouting holes and blasting holes; Small well drilling.
Main Application
The main causes of drill pipe fracture
1, The bending moment of drill pipe is too large during reaming and pipeline pullback;
2, The causes of excessive bending moment are as follows: first, the actual curve of the guide hole deviates greatly from the theoretical curve; Second, the hole after reaming is irregular, which makes the pipe form an angle with the reamer and the drill pipe axis.
Other reasons:
1, In order to save investment, the directional drilling equipment used by the construction contractor (i.e. Party A) does not match the actual needs of the project construction. The tonnage of the directional drilling equipment is too small, the maintenance is not timely, and the failure rate is high, which makes the directional drilling force uneven. At the same time, the stop and go construction makes the hole forming quality poor, the hole irregular, the drilling tool is easy to lock, resulting in the fracture of the drill pipe;
2, The selection of reamer model is unreasonable. Failure to select the matching rule model according to the actual geological conditions, resulting in increased drilling torque, increased drill pipe wear and fracture;
3, When the rock reamer reams or cleans the hole, the drill pipe is not connected at the back, and the reamer swings greatly in the hole, which may cause the drill pipe and the main shaft of the reamer to break;
![]() |
St 50 Meters Small Water Well And Engineering Drilling Rig For Personal Use Images |