Sign In | Join Free | My fazendomedia.com
China Jinzhou City Shitan Machinery Equipment CO. LTD. logo
Jinzhou City Shitan Machinery Equipment CO. LTD.
Jinzhou City Shitan Machinery Equipment CO. LTD Drilling Rig / Drill Rod / Drill Bit / Track Transporter / Drilling Mud Pump
Verified Supplier

7 Years

Home > Water Well Drilling Rig >

St 180 Borehole Large Pneumatic Water Well Drilling Rig Machine

Jinzhou City Shitan Machinery Equipment CO. LTD.
Trust Seal
Verified Supplier
Credit Check
Supplier Assessment
Contact Now

St 180 Borehole Large Pneumatic Water Well Drilling Rig Machine

  • 1
  • 2

Brand Name : ShiTan

Model Number : ST 180

Certification : ISO9001

Place of Origin : China

MOQ : 1 set

Price : Negotiation

Payment Terms : T/T, Western Union

Supply Ability : 50000 sets per year

Delivery Time : Within 7-12 days

Packaging Details : Wooden box

Product Name : Water Well Drilling Rig

Color : Red Yellow

Feature : High Drilling Efficiency

Usage : Water Well,exploration,soil testing

Application : Water Well drilling

Power Type : Diesel

Drilling depth : 180 meters

Warranty : 1 Year

Voltage : 220V/380V

Length of drill pipe(mm) : 3m

Condition : New

Drilling Depths : 180 meters

Contact Now

St 180 Borehole Large Pneumatic Water Well Drilling Rig Machine

ST180 Water Well Drilling Rig Product Description

In practice, it is mainly used for dig water well, monitoring well, geothermal air-conditioner hole, and anchoring hole, especially the groundwater exploiting projects,it is a newly-developed multifunctional hydraulic driller, it is highly efficient and energy saving. .Pneumatic water well drilling machine should be used together with air compressor, it can add mud pump and foam pump. Need to use different drilling tools such as: drill rod, hammer, rock drill bits, etc

ST180 Water Well Drilling Rig Techical Data

Drilling RIg Name
ST180 Drilling Machine
Drilling hole diameter
140-254mm
Drilling depth 180m
One-time advance length 3.3m
Walking speed 2.5km/h
Climbing angles (Max.) 30
Equipped capacitor 55kw
Using air pressure 1.7-2.5mpa
Air consumption 17-31m³/min
Drill pipe length 1.5m, 2.0m, 3.0m
Drill pipe diameter 76mm, 89mm
Rig lifting force 12t
Swing speed 45-65rpm
Swing torque
3200-4600(N.m)
Dimension 3800*1500*2200mm
Weight 4500kg

ST 180 Water Well Drilling Rig Advantages

The water well drilling machine can only be used after all parts are firmly installed and connected before being used for drilling. The following are the relevant operation steps for adding and connecting the drill pipe of the water well drilling machine: 1. When it is necessary to add and connect the drill pipe at the depth of one drill pipe after drilling, stop the propulsion first, then stop the rotation, and turn off the cooling water; 2. Operate the clamping handle to make the gripper clamp the drill pipe and open the micro regulating flow valve (right rotation); 3. The gyrator reverses, at the same time, it retreats the feed oil cylinder to rotate the water braid shaft away from the drill pipe; 4. Stop the rotation and operate the fast forward and backward handle to the fast backward position to make the chuck quickly back in place; 5. Connect the drill pipe to be added to the previous drill pipe, and the rotator moves forward while rotating. When the trapezoidal conical thread of the water braid shaft is in screw contact with the conical thread of the newly added drill pipe, immediately operate the gripper handle, loosen the gripper and complete the drill pipe addition
FAQ

Q1: Are you factory or trade company?
A1: We are factory.
Q2: What the exactly address of your factory?
A2: Our company is located in Jinzhou ,Shijiazhuang,Hebei, China
Q3: Warranty terms of your machine?
A3: One year warranty for the machine and technical support according to your needs.
Q4: Will you provide some spare parts of the machines?
A4: Yes, of course.
Q5: What about the voltage of products? Can they be customized?
A5: Yes, of course. The voltage can be customized according to your equirement.
Q6: Which payment term can you accept?
A6: 30% T/T in advanced, 70% T/T before shipment
Q7: How long will you take to arrange production?
A7: 380V 50HZ we can delivery the goods within 7-15 days. Other electricity or other color we will delivery within 25 days.

How do the drillers replace the bit?

During drilling, the power of the drilling rig drives the rotary table, Kelly, drill pipe and drill bit to rotate. Observe the working condition of the down hole drill bit through the instruments on the ground of the drilling rig. After comprehensive judgment, if the drill bit is considered to have been worn, stop drilling immediately and replace the drill bit. After the drilling is stopped, the drilling fluid circulation shall be maintained for a period of time. The purpose is to adjust the performance of the drilling fluid, bring the rock cuttings suspended in the drilling fluid out of the ground, circulate to keep the new borewell wall stable, and conduct routine inspection of the drilling equipment. The driller uses the crown block, traveling block and hook on the derrick to pull out all drilling tools from the well according to the height of the derrick and the column (usually composed of two or three drill pipes). After pulling out, the drill pipe column is discharged into the derrick in sequence. While lifting the down hole drill string, the drilling fluid shall be continuously injected into the annular space with the drilling pump to keep the liquid level in the borewell from falling, so that the pressure in the borewell can balance the formation pressure, so as to prevent the borewell from collapsing or the fluid in the down hole formation from entering the borewell. At the same time, pay special attention to the possible sticking of the drill pipe due to the wall shrinkage, and the operator shall strictly control the lifting speed. After all the drill pipes and drill collars in the borewell are pulled out, the drill bits to be replaced will be pulled out at the same time. The workers can resume drilling after unloading the old drill bits, installing new drill bits and lowering them into the well according to the original column sequence.

St 180 Borehole Large Pneumatic Water Well Drilling Rig Machine

St 180 Borehole Large Pneumatic Water Well Drilling Rig Machine

St 180 Borehole Large Pneumatic Water Well Drilling Rig Machine

St 180 Borehole Large Pneumatic Water Well Drilling Rig Machine


Product Tags:

180m borehole drilling equipment

      

large pneumatic borehole drilling equipment

      

180m depth water well drilling rig

      
Best St 180 Borehole Large Pneumatic Water Well Drilling Rig Machine wholesale

St 180 Borehole Large Pneumatic Water Well Drilling Rig Machine Images

Inquiry Cart 0
Send your message to this supplier
 
*From:
*To: Jinzhou City Shitan Machinery Equipment CO. LTD.
*Subject:
*Message:
Characters Remaining: (0/3000)