Sign In | Join Free | My fazendomedia.com
China Jinzhou City Shitan Machinery Equipment CO. LTD. logo
Jinzhou City Shitan Machinery Equipment CO. LTD.
Jinzhou City Shitan Machinery Equipment CO. LTD Drilling Rig / Drill Rod / Drill Bit / Track Transporter / Drilling Mud Pump
Verified Supplier

7 Years

Home > Drill Gyrator Assembly >

High Speed Drill Gyrator Assembly GK180 / GK 200 / XY-1A For Geological Drilling

Jinzhou City Shitan Machinery Equipment CO. LTD.
Trust Seal
Verified Supplier
Credit Check
Supplier Assessment
Contact Now

High Speed Drill Gyrator Assembly GK180 / GK 200 / XY-1A For Geological Drilling

Model Number : GK-180 / GK 200 / XY-1A / XY-1B

Certification : ISO9001

Place of Origin : China

MOQ : Negotiation

Type : Drill Gyrator Assembly

application : geological drilling machine

certification : ISO9001

Price : Negotiation

Delivery Time : Within 7-12 days

Payment Terms : L/C, D/A, T/T, Western Union

Brand Name : ShiTan

Contact Now

High Speed Drill Gyrator Assembly GK180 / GK 200 / XY-1A For Geological Drilling

Function : Rotary drill and drill tool feed.


Structure: Most of the parts of the gyrator are installed in the vertical shaft box. The small bevel gear is mounted on the inner gear shaft through the spline. The ring seat has a ring-shaped "T" bolt and is combined with five "T" bolts. The sleeve is fixed, and the nut on the “T” bolt can be loosened to adjust the tilt angle of the gyrator to achieve angular drilling.

The connection between the gyrator and the gearbox is to fix the turret seat on the gearbox body with 8 bolts. The large bevel gear is connected with the vertical bushing via a key, and the vertical bushing is connected with the vertical car through the hexagonal hole, thereby driving the vertical shaft to rotate the vertical shaft in the vertical shaft. The sleeve can be moved axially, and the movement is realized by pushing the piston rod and the beam into the upper chamber or the lower chamber of the cylinder.
The top shaft is terminated with a top sleeve, and the top sleeve is provided with six steel balls. When the anti-manipulation handle is pressed downward, the six steel balls are pushed toward the center of the vertical shaft through the inner jacket, and the semicircular communication groove of the drill pipe is embedded in the upper shaft. Inside, the drill pipe is clamped on the machine to realize the movement of the drill. When the handle is lifted up, the steel ball is disengaged from the drill pipe and can be inverted.
In order to display the scale of the vertical shaft stroke, a top sleeve with a hexagonal hole is arranged at the upper end of the vertical shaft, and the rotary motion can be transmitted to the drill pipe of the hexagonal machine.

High Speed Drill Gyrator Assembly GK180 / GK 200 / XY-1A For Geological Drilling


Product Tags:

drilling rig parts

      

drilling rig components

      
Best High Speed Drill Gyrator Assembly GK180 / GK 200 / XY-1A For Geological Drilling wholesale

High Speed Drill Gyrator Assembly GK180 / GK 200 / XY-1A For Geological Drilling Images

Inquiry Cart 0
Send your message to this supplier
 
*From:
*To: Jinzhou City Shitan Machinery Equipment CO. LTD.
*Subject:
*Message:
Characters Remaining: (0/3000)